More actions
Assigned Time Total FTE (Full Time Equivalent) is the proportion of overall faculty Total Workload FTE for a particular term or academic year that is spent on assigned time tasks outside of instructional administrative, instructional faculty, or other support duties.
| Metadata | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Data Custodian | |||||||||
| Academic and Centralized Scheduling | |||||||||
| Data Source | |||||||||
| |||||||||
| Logical Transformation / Calculation | |||||||||
| Divide sum by 150 | |||||||||
| Dataset Folder and Field Name | |||||||||
| |||||||||
This is calculated as: (WTU1 + WTU2 + WTU3)/150.